Refurbishment Project

Progress to Date

Latest News | October | August | July | June | May | April

June 2010

20th June 2010

Even beneath the scaffolding, the stonework on the outside of the building is looking much cleaner. The stonework from the old entrance to the hall is now in place on the new entrance.

The tower under scaffolding with cleaned stonework
The tower with cleaned stonework
Window stonework under polythene
Window stonework still under wraps
The new entrance boarded up but with exterior stonework in place
The new side entrance

13th June 2010

The disabled toilet is taking shape. This is immediately on the left after entering the building from the St Peter's Street entrance.

More work is being done behind the scenes upstairs, much of which is inaccessible.

The new side entrance to the hall has been started. This will be on the Castle Street side, opposite the church.

Internal walls for the new disabled toilet
The disabled toilet
The upstairs floor
The upstairs floor
The new hall entrance from inside the hall
The new hall entrance from inside the hall
The stonework for the new door arranged on the ground
The stonework for the new door will be recycled from the old side entrance